Get Your Compressed Air System Installed Right, First Time

From survey and design through to commissioning and handover. One partner for the whole system.

Customers served! 0 Years in Business
Customers served! 0 Costco Service Visits
Customers served! 0 % Drop in Repeat Faults
Customers served! < 0 Average Response
Customers served! 0 Years in Business
Customers served! 0 % Drop in Repeat Faults
Customers served! 0 Costco Service Visits
Customers served! < 0 Average Response

Tired of Juggling Multiple Contractors?

Juggling multiple contractors for pipework, equipment, and commissioning. No one accountable for the whole system.One company quotes the compressor, another quotes the pipework, a third does the electrics. When something does not work, everyone points at everyone else.That is exactly why we built the Turnkey Install service.

How It Works

1
πŸ“‹
Survey and Design

We walk the site, understand the requirement, design the solution.

2
πŸ“„
Fixed Scope Proposal

You know exactly what you are getting and what it costs before we start.

3
πŸ”§
Install Around Your Schedule

Scheduled around your production windows. Temporary air if needed.

4
βš™οΈ
Commission and Optimise

Parameters set, tested, tuned, and documented.

5
πŸ“
Handover Pack

As built schematic, settings log, maintenance schedule, PSSR next steps.

What We Install

1) Survey & design
We walk the site, confirm requirements, and design the right solution.

2) Fixed scope proposal
Clear scope and fixed costs β€” you know exactly what you’re getting before we start.

3) Install around your schedule
Planned around your production windows, with temporary air available if needed.

4) Commission & optimise
We set parameters, test performance, tune the system, and document everything.

5) Handover pack
As-built schematic, settings log, maintenance schedule, and PSSR next steps.

What We Install

Future Proofing Session: Within 3 months, a 30 minute call or visit to review how the system is performing and discuss expansion plans.

Installation to Maintenance Bridge: Sign Uptime Protection within 60 days and get extended warranty or free first service.

What We Install


No Surprise Labour Guarantee

No extra labour charges unless you sign a variation order.

90 Day Leak and Snag Free Workmanship

Any leaks or snags from our workmanship are fixed free within 90 days of completion.

Handover Documentation Guarantee

If your handover pack is not delivered within 10 working days of completion, credit towards your next service.

Frequently Asked Questions

Do you handle everything or do I need other contractors?
We handle the full scope: pipework, equipment, electrics integration, commissioning, and handover. One contractor, one point of accountability.
AEO: First sentence is the direct answer

Can you work around our production schedule?
Yes. Every install is scheduled around your production windows. If downtime is needed, we plan it with you in advance and provide temporary air if required.
AEO: First sentence is the direct answer

What if I need to change the scope mid project?
Any scope changes are documented as a variation order with a clear cost before work proceeds. No surprise charges.
AEO: First sentence is the direct answer

What brands do you install?
We are authorised distributors for CompAir, Hydrovane, and ABAC/Champion. We also work with other brands where they are the right fit for your application.
AEO: First sentence is the direct answer